Concrete Mix Calculator: Cement, Sand, Aggregate

Choose the concrete grade and enter the volume, or the length, width and thickness of the slab. The calculator gives the 50 kg cement bags, sand and coarse aggregate in m³ and cft, and the water for your water–cement ratio.

Concrete grade (nominal mix)
Enter
Units
Cement (50 kg bags)8.1 bags
Cement weight403 kg
Sand0.42 m³ (14.8 cft)
Coarse aggregate0.84 m³ (29.7 cft)
Water202 litres
Wet concrete volume1 m³ (35.3 cft)

M20 nominal mix 1 : 1.5 : 3 (cement : sand : aggregate). Dry volume = wet volume × 1.54; cement is taken at 1,440 kg/m³ (one 50 kg bag ≈ 0.0347 m³). IS 456 allows nominal mixes up to M20; for M25 and stronger concrete, use a design mix from a lab. Add 2–5% for wastage.

How the quantities are worked out

Wet concrete shrinks when the voids fill, so the dry volume of materials is taken as 1.54 times the wet volume. That dry volume is split in the mix ratio. For M20 (1 : 1.5 : 3, total 5.5 parts) and 1 m³ of concrete: cement = 1.54 × 1 ÷ 5.5 = 0.28 m³ = 403 kg ≈ 8.06 bags; sand = 0.42 m³ (about 14.8 cft); aggregate = 0.84 m³ (about 29.7 cft).

Nominal mix ratios

M5 = 1 : 5 : 10, M7.5 = 1 : 4 : 8, M10 = 1 : 3 : 6, M15 = 1 : 2 : 4, M20 = 1 : 1.5 : 3 and M25 = 1 : 1 : 2. The number after M is the characteristic compressive strength in N/mm² (MPa) after 28 days, so M20 concrete is designed for 20 N/mm².

Nominal mix or design mix?

IS 456 permits nominal mixes for concrete up to M20. For M25 and above, a design mix based on trial batches with your actual cement, sand and aggregate is recommended; it usually uses less cement for the same strength. Treat the M25 row here as an estimate for small works.

Example: a slab

A 5 m × 4 m slab 125 mm (0.125 m) thick holds 2.5 m³ of concrete. In M20 that needs about 20.2 bags of cement, 1.05 m³ of sand and 2.1 m³ of aggregate, before wastage.

Frequently asked questions

How many cement bags are needed for 1 m³ of M20 concrete?

About 8 bags of 50 kg (403 kg) for a 1 : 1.5 : 3 nominal mix, using a dry volume factor of 1.54.

What is the M20 concrete ratio?

1 : 1.5 : 3 — one part cement, one and a half parts sand and three parts coarse aggregate by volume.

Why multiply by 1.54?

Dry materials occupy more volume than the finished concrete because the voids between particles fill with cement paste and water. 1.52–1.57 is the usual allowance; 1.54 is the common site value.

How many cubic feet are in one bag of cement?

One 50 kg bag is about 0.0347 m³, or about 1.23 cubic feet.

You may also like

Steel Bar Weight Calculator

Rebar kg per meter with D²/162.

N/mm² to MPa

1 N/mm² = 1 MPa: concrete and steel strength.

N/mm² to kg/cm²

1 N/mm² = 10.197 kgf/cm².

kN/m² to t/m²

Soil bearing capacity: 1 t/m² = 9.81 kN/m².

Brick Calculator

Bricks and mortar for a wall.

Concrete Volume Calculator

Volume of slabs, footings and columns.